SlideShow

  • 21.05.24 tank 1 work begins
  • 21.05.24 tank 2 paint complete
  • 21.05.19 tank top paint 1
  • 21.05.19 tank top paint 2
  • 21.05.12 clearwell after painting
  • 21.05.12 New and old clearwell
  • clearwell painting 2
  • clearwell painting 1
  • clearwell painting 3
  • 21.03.11 Clearwell tarp
  • 21.03.11 under tarp
  • 21.02.19 clearwell baffles
  • 21.02.19 intake and overflow pipes
  • 21.02.10 clearwell tarp
  • 21.02.10 Clearwell tarp close
  • 21.02.03 Clearwell with tarp lines
  • 21.01.26 clearwell pic
  • 20.01.21 clearwell 1
  • 20.01.21 clearwell 2
  • 21.01.14 clearwell pic
  • Tank scaffolding 4
  • Tank with scaffolding 2
  • Tank with scaffolding 1
  • Tank with scaffolding 3
  • Scaffolding around tank for painting tent
  • Reservoir 3
  • Reservoir 2
  • Reservoir 1
  • Reservoir inside
  • pipe connect at night
  • pipe connection
  • Group in tank
  • Laurie Fred pipe in tunnel
  • Eric, Carolyn, Christine
  • Christine signing pipe
  • 20.10.19 drone
  • 20.10.12 Clearwell
  • 20.10.12 pipeline
  • 20.10.06 drill  at end of tunnel on plant side of river
  • 20.10.06 pipe prepped to go in drilled tunnel under river
  • 20.10.06 journey from drill to water plant
  • 20.10.06 drone
  • 20.10.06 drill on west side of river
  • 20.10.06 drill  at end of tunnel on plant side of river
  • 20.10.06 waterline prepped to go in drilled tunnel under river
  • 20.10.02 drone
  • 20.10.02 pipe
  • 20.09.17 drone
  • 20.09.17 west of river staging
  • 20.08.25 drone
  • 20.08.18 drone
  • 20.08.18 foundation
  • Early morning concrete pour on August 13
  • 20.08.10 drone
  • 20.08.10 high view
  • 20.07.28 drone
  • 20.07.10 vault
  • 20.07.10 drone
  • 20.07.02 closer
  • 20.07.02 drone
  • 20.06.23 drone
  • 20.06.19 drone

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to WTP clearwell, raw waterline projects 2020 photos